Customer Stated: She wanted to have a quote for having the sewage/drain line along with hot/cold water lines relocated for the washing machine. Tech Notes: Upon inspection I found that this washing machine box is located in the main level utility room of home. I found that we would need to move the sewage lines, and water lines 3.5’ - 4’ to the right of current location. I presented options to have this done for a different date, and the h/o elected to move forward with repairs. Resolution: We will be relocating sewage/drain lines along with hot/cold water lines 3.5’ - 4’ to the right of current washing machine box location. Job Notes:**Please charge the same CC in Santos pictures for todays sold estimate that will be completed at a later date**Please adjust sold estimate for later date, and not completed for todays date**The h/o would like to have this scheduled for next Monday afternoon if possible** Job Status: Incomplete Estimates: Sold for later date This is a complimen