Both workers did a great job. They were knowledgeable and friendly and finished the job in a timely manner.
Overall Experience
Quality
Price
Convenience
Upon arrival, I identified that the data tag was missing from the equipment. However, I successfully retrieved the BTU information from the burner tag. This allowed me to proceed with the installation. The process involved careful assessment and precise measurements to ensure compatibility. I completed the installation in a timely manner, and it is expected to be fully operational within 2-3 days. My expertise ensured a smooth and efficient job, minimizing any potential disruptions.
Upon receiving the initial inquiry, I promptly assessed the requirements and provided a detailed estimate. This estimate included a comprehensive breakdown of the services to be performed, such as diagnosing the issue, parts replacement, and labor costs. I ensured that all potential expenses were clearly outlined to avoid any surprises. The estimate was meticulously prepared to reflect the quality and reliability of the work I deliver. I am now awaiting approval to proceed with the job, confident that the client will find the proposed solution both fair and satisfactory. Once approved, I will begin the work, ensuring that every step is carried out with precision and care.
DONE MAINTENANCE NEED TO RETURN WITH A 12 FT A FRAME LADDER AND 8————20X20X2 FILTERS 2————25X25X2 FILTERS 2————20X25X2 FILTERS Job complete
COMMERCIAL ROOF TOP MAINTENANCE IN CHILLCOTHE OHIO
I was called to a home to change the air filters, clear the condensation drain, and clean the coils. I arrived at the house and began by changing the filters. The air filters were dirty and needed to be replaced. I then cleared the condensation drain, which was clogged with dirt and debris. The coils were also cleaned, which helped improve the efficiency of the air conditioner. After completing the job, the customer was happy with the results and thanked me for my service.
Changed filters and checked operation of sequence
Checked boiler operation and completed rms paperwork.