Responded to no heat complaint on aging system previously converted between NG and propane. Inspection revealed multiple critical issues including rusted burners, caked heat exchanger, failing inducer motor, and gas valve with pressure regulation problems. Due to extensive deterioration and multiple component failures, complete system replacement was performed rather than costly repairs on the end-of-life equipment.