Installed new customer supplied ABS sch40 P-trap onto existing garbage disposal. Tested as required.
Installed a 50g tall, natural gas, atmospheric water heater.
Gave options for installing 2in1 sump pump/backup as well as keeping existing pump and installing separate 12v backup pump.