Replaced damaged frost-proof Prier hose bibb due to broken handle and sheared screw in stem. Installed new assembly with Y-splitter, ensuring proper connection and functionality. Unit now operates correctly with both water outputs accessible via dual control knobs.
Responded to service call for a leaking furnace. Identified multiple issues including water accumulation in mechanical room and plugged venting system. Cleared obstructed ventilation and documented damaged vent cap that requires replacement on follow-up service visit.
Replaced outdated and leaking 40-gallon water heater with new 50-gallon TGL unit. Inspected potential venting obstruction and addressed concurrent furnace leak. Installation completed per manufacturer specifications with all necessary connections properly sealed and tested.
Replaced aging 40-gallon water heater with new 50-gallon TGL model to address active leakage issue. Inspected and remediated potential obstruction in ventilation system. Also identified leaking furnace which will require separate service.
Replaced outdated 40-gallon water heater with new 50-gallon TGL unit due to leaking condition. Addressed possible obstruction in ventilation system and resolved leak issue. Installation completed in utility room with proper connection to existing plumbing and venting systems.
Completed residential service call to address lack of sump pump and code violations. Installed new sump pump system with battery backup to provide flood protection. Also addressed non-compliant water heater issues, bringing it up to current code requirements, and inspected faulty water softener with pressure gauge reading approximately 80 psi.
Performed comprehensive boiler tune-up service, including thorough cleaning of burners and components that had accumulated significant dirt and debris. Conducted carbon monoxide testing with satisfactory readings and verified proper gas pressure levels. Inspected overall system operation, confirmed appropriate temperature settings, and provided safety recommendations regarding flammable materials near the boiler unit.
Diagnosed tank-type water heater failure with leakage onto the burner assembly, causing repeated shutoff after restart attempts. Visual inspection confirmed water damage to heating components. Complete unit replacement was performed to restore hot water service.
Removed and replaced a rusted garbage disposal that was jammed with coffee beans, which had caused sink drainage failure and standing water in dishwasher. Completed system reconnection and verified proper drainage with no leaks detected after installation.
Responded to service call for malfunctioning water shut-off valve in master bathroom. Diagnosed broken angle stop on toilet where handle had separated and valve was not fully closing. Replaced defective angle stop valve and installed new stainless steel braided supply line to restore proper water flow control to toilet.
Performed annual maintenance on 8-year-old FRP furnace for Reward member. System operational with proper combustion and heating performance. Completed tune-up including flame sensor cleaning, ignitor inspection, electrical connection verification, and filter replacement. Electrical parameters verified with multimeter showing normal readings.
Completed plumbing inspection. The upstairs toilet in the hallway has the old ball cocks type fill valve; recommended replacement with new style. The right faucet in the double vanity for the master bathroom is seeping through the cartridge.
Installed dishwasher, customer supplied water supply line, had to extend discharge hose to reach under sink cabinet. Tested everything and no leaks.
Estimate signed to install laundry tub, approx 45-60 minutes of labor.