Performed on-site assessment of 30-year-old electric boiler system per customer request. Inspected existing plumbing infrastructure including copper piping, valves, and electrical connections in utility area. Evaluated current wood boiler setup and discussed supplemental heating options. Gathered necessary information to prepare estimate for replacement with either electric or LP boiler system.