We successfully completed a service for a supply main pipe (SMP) renewal. Upon inspection, we discovered that a 10-inch supply run had detached in the attic. Our team promptly addressed the issue by reattaching the supply run. To ensure the system was functioning correctly, we ran a comprehensive diagnostic test. The system is now fully operational, and the supply air temperature has been confirmed at 105 degrees. Our thorough approach guarantees that no further issues will arise, providing peace of mind and optimal performance for the system.