Today, we successfully installed a new flange and toilet. The installation process began with the precise fitting of the flange, ensuring a secure base for the toilet. Following this, we carefully positioned and connected the toilet, paying attention to every detail. Multiple tests were conducted to confirm the installation's integrity, and a thorough walk-through was completed with the client. No leaks or drips were observed, indicating a successful job. Photos and video are available for review.