Responded to no heat call for boiler system. Upon inspection, identified heating failure caused by blockage in ventilation ductwork. Cleared obstruction and applied leak detection tape to monitor potential leak points in galvanized metal ducting. System now operating at normal parameters with proper heat distribution.