Installed new towel warmer radiator in the second floor bathroom, including mounting, connection to existing hydronic piping system, and installation of thermostatic valve. Completed first phase of boiler project, which included removing old radiator, capping bathroom lines, replacing radiator valve on upstairs unit, bleeding radiators, and removing gas line from upper level to kitchen.