Performed routine maintenance tune-up on 21-year-old forced air system. System was operational with no functional issues noted. Replaced existing flexible exhaust duct with recommended hard pipe ducting to improve efficiency and safety. Inspected electrical connections and verified proper wiring at circuit board terminals.