Upon inspection, it was determined that the system required a new gas valve to ensure proper functionality and safety. I communicated the issue to Sean and explained the necessity of the replacement. Sean approved the work and we agreed that the replacement would be carried out in the morning. I ensured all necessary steps were documented in pinned notes for future reference and to maintain a clear record of the work performed. The new gas valve was installed successfully, and the system is now operating as intended.