No failing parts on the tall electric tank. Customer wants it replaced with a tankless. Also wants radon mitigation installed in the sump pump. Sent estimates over for both. Customer wants to build his own floor mounted rack for the tankless to go on, will need to follow up with customer on dimensions for tankless stand.