I successfully completed the task by replacing the necessary parts and thoroughly testing the heating system. The line pressure was initially at 11 inches, and after the replacement, I adjusted the output to the recommended 10 inches. This adjustment ensures optimal performance and efficiency of the heating system. Each component was carefully inspected and tested to confirm that the system operates correctly and safely. The heating system is now fully functional and ready for use.