Responded to customer report of boiler issues after providing 30-minute advance notice. Upon inspection, discovered wet igniter wire and significant water leakage from the heat exchanger. Diagnostic assessment confirmed heat exchanger failure requiring complete replacement. Documented corrosion at pipe connections and visible water damage to surrounding wall area as supporting evidence.