House has hydronic copper fin tube baseboard heaters. Piping froze and split. House is to be gutted, replace baseboard heaters throughout. Condition of the remainder of the existing copper piping is unknown. Boiler is a newer high efficiency Triangle Tube. The condition of the boiler is unknown at this time. Will need to be drained for winter.