Wire in a new location generator inlets for the home. Supply and install a 50 amp breaker, inlet, conduit, interlock kit and wiring at the service disconnects. Load management will be up to the customer when running the generator for back up power. During the event power is lost to the home follow these steps: 1) Turn all breakers off at main panel along with the main breaker at the meter. When you shut the main off slide the interlock into place to turn the 50 amp breaker on. 2) Use a cord to go from the generator to the inlet that’s next to the meter and start the generator up and let it come to an idol. 3) Go back to the main panel and turn breakers on slowly as to not rush the generator with a big load. When power has been restored you will follow the same process. 1) Turn the breakers off at the main panel 2) Shut off the generator and when it completely stops unplug the cord 3) Shut 50 amp breaker off and slider interlock to turn main on 4) Go back to the main panel and