Installed wet switches and UV light. I removed the failed duct and sealed the plenum. I installed a new compressor and filter drier. I pressure tested the system and pulled a deep vacuum (280 microns). I added fresh refrigerant and charged it with all zones open. I charged it to the manufacturer specifications. The mainfloor system was operating at the end of service call.