Upon arrival, we completed the trim out and passed final plumbing inspection. -sealed all hub drains. -installed mop sink basin. -insulated the remaining pipes in the basement per inspector requirement. -insured all sinks are installed and operational. We tested all fixtures and drain lines in preparation for a final inspection