For this job we installed a 26kw home generator on the left hand side of the home. We installed a transfer switch next to the meter main combo and piped under ground in pvc pipe down to the generator. We also installed three load shed modules on the ac units. Mobile link was installed on the unit. Waiting on inspection and will come back and perform the QC.