Saw cut and removed concrete slab to expose existing drain piping. Modified existing drain line to accomodate new toilet location and upsized drainage for a shower instead of a tub. Also installed customer supplied shower valve and diverter valve and roughed in new rain head and shower heads. Tested for leaks and proper function.