Today I worked on doing a cleanup for a Ruffin inspection on walls damaged by water. I went in and pulled all the plugs and switches out, pulled out the cut in boxes and put in slider boxes. I moved the stove wire into the wall and added a double gang box and secure all my wiring and everything for rough and inspection once the rough in inspections is OK I will come back and install plug switches in devices.