Replaced broken elbow for flue pipe. Had to reconfigure flue and re strap because flue wasn’t secured properly. Now flue for second floor is safe and secure. Cleaned blower wheel and housing. Checked operations for second floor system. Removed old duct board return plenum for main floor system and installed metal plenum with new collars and filter rack. Sealed and secured plenum. Checked operations.