During our visit, multiple repairs were completed. A new pressure reducing valve and main shutoff valve was installed in the basement. Each hose bib was replaced and secured. A new isolation valve was installed for the front hose bib. Drywall had to be removed to access both hose bibs. A new expansion tank was ball valve was installed at the water heater. The master bathroom toilet was reset with a new wax ring and bolts. A new shutoff valve and supply line was also installed at the master bath toilet. These repairs were tested for leaks and functionality after completion. Thanks for choosing Te Certified!!!