Install drain line and wet switch water safeties for the upstairs and main floor systems. Cleaned both condenser coils, replaced dual capacitor for main floor AC. Added 2lbs of refrigerant to main floor unit. 6/02- LM and sent text to schedule- TW 6/03- Spoke w/Mrs. She is out of town for the week but will discuss w/her hubby and call us back to schedule one day next week- TW Main Floor