Today we completed multiple plumbing installations throughout the home. In the first floor, half bathroom, we installed a new vanity, along with new faucet, hot and cold supply stops, and a new P-trap. All connections were properly secured and tested. In the basement bathroom, we installed a new toilet flange and set the customer supply toilet, ensuring proper alignment and a water type seal. We also installed new Delta shower trim on the existing shower valve and verified proper operation. Additionally, we installed a wide vanity in the basement bathroom, complete with a new faucet, hot and cold supply stops, and a new P-trap. To properly accommodate vanity, drawer configuration, we reworked the existing water supply lines, and drain piping to ensure proper clearance and functionality. All plumbing components were connected, tested, and inspected for leaks. At this time, all plumbing installations are complete and operating properly.