Dug down to expose the 2” waterline that serves building complex so that we could replace the RPZ and pressure reducing valve for the complex. Removed section of leaking pipe and installed new piping with RPZ and pressure reducing valve. After installing the valves we then restored water back to the complex, checked repair for leaks and found none. Test of water pressure to be good at 65 psi.