For this job the customer was wanting to know if they had enough space in the generator sub panel to add an A/C circuit, they did not have enough so she wanted to free up some space and take 4 circuits off the generator sub panel to make room for 2 a/c units so we moved those 4 circuits back over to the main panel. We installed 3 whole home surge protectors with new breakers and we saw that there were 10 wrong breakers installed among the 4 panels installed. We will be changing those out to the right breakers for the customer.