Dig at penetration and at the water meter, dig an 18” trench the entire run of the water line to the house, put new water line in the trench and backfill. PRV and main shutoff discounted from the cost. Roughly 160 feet run. Run a new water line from the new service to the yard hydrant. Relocate hydrant to close side of the driveway Install a dual check valve assembly (DCVA) for connections to the existing irrigation line, this option allows us to connect the new service back to the irrigation system and with proper backflow contamination prevention system.