For this job we installed a 26kw on the left hand side of the home. We installed two non service rated transfer switches inside the basement next to the main panel. I pulled the AC circuit out of the meter main combo and installed it in the right hand side main panel so the AC would function with the generator. We also installed two delay modules on the small ac units. Customer already has whole home surge protection. Waiting on gas inspection to pass and will come complete the QC visit and do start up on the generator.