For this job, I worked on installing a dedicated 20 amp circuit from the panel down to the crawlspace. left an outlet 3 feet from the entrance as requested by installer of encapsulation company. Tested voltage and connections upon completing, did you drop in to hear when you were driving Calhoun you have that right? Yeah everything is working properly.