YOUR NEW HVAC SYSTEM INSTALLATION INCLUDES: NEW EQUIPMENT: - New Furnace REMOVAL & DISPOSAL: - Removal, disposal, and recycling of existing equipment PROFESSIONAL INSTALLATION: - New indoor support blocks and drain pan - New water safety switches with flood protection (if applicable) - Adaptation to existing plenums - Connection of all electrical (high/low voltage) - New flexible gas line and hard pipe gas connection to furnace (if applicable) - Bring existing flue pipe up to current code as needed with double wall flue pipe - Mastic seal equipment connections to ensure optimal efficiency SYSTEM SETUP & TESTING: - Perform leak check - Full start-up and testing of cooling and heating modes CUSTOMER CARE: - Instruction on operation of new equipment - Jobsite cleanup to your satisfaction PERMITTING: - All work performed to meet or exceed code requirements - TE will pay permitting fees, file necessary documents, and secure permit ***The quoted pricing includes all required material,