Arrived today to complete partial drain line repipe as well as installing new shower valves for the master and hallway bathrooms. The install includes all remaining cast iron except for the venting which the stacks will not be replaced. Today we got most of the drain work done, tomorrow we will return to complete the drain work and install the two shower valves. Returned on site to complete work that was quoted. Today we installed both shower valves as well as tied all existing drains back into the pvc main. Tested work thoroughly with no leaks or fails, cleaned work areas as well. Client is aware TE is not responsible for any type of tile or drywall repairs. As stated work is complete and client is satisfied.