For this job, we installed 5 new kholer Kingston toilets. We also replaced the angle stop in the guest bathroom for toilet. We replaced the cartridge in the master bathroom shower. There was also two sinks draining slow in the master bathroom. We installed two new p traps and cleared the clog in the pop up. Once complete we caulked around toilets and tested our work no issues.