Replacing meter outside with 200amp meter, increasing power input to home. Replace service wire from meter to panel, going from 3wire system to 4wire. Replace electrical panel with new panel and new whole house safety breakers. Install grounding system as currently does not have it. Install smoke detectors per code in each bedroom.