-Installed new Standard 6 year Rheem electric WH with all required code upgrades and installation inspection. Re-pressurized water to the home, filled up water heater and bled all of the air from the plumbing system. Fired water heater and set temperature to 120°. Checked all work performed for leaks and proper functionality. Cleaned up work area.