For this job, we installed three new kholer high line ark toilets. We removed all of the old ones, and took them with us. We also noticed two broken flanges one in the upstairs bathroom, and the other in the half bathroom. We replaced both with new flanges, and secured the, to the floor. The customer also wanted a pedestal sink removed, and a single vanity installed. We removed the old pedestal sink, and cut out the base mold for the new vanity to be flush to the wall. We secured, and caulked around the new vanity. The last thing we did was install two new lav faucets, and pop ups in the upstairs guest bathroom. We performed work, tested everything, and cleaned up. Thank you for choosing TE Certified.