9/11/23 Confirmed by Lance P. for 9/13/23 at 11:45amish / Sent email regarding inspection DH Sprinkler Inspection Annual Fire Sprinkler Inspection (1 Wet System) Deficiency: Fire department connection, caps are missing and must be replaced by FDC must be flushed and clean to make sure there’s no debris inside Deficiency: Sprinkler system is due for five year internal inspection of piping. A manlift will be required to perform this task 2- 4” Victaulic couplings Deficiency: Fire department connection is due for hydrotest. 2- 4” Victaulic couplings Deficiency: Fire department connection will need new caps 🧢
8/9/23 Confirmed with Mark S. for 8/10/23 at 8:00ish DH /Sent email regarding inspection DH Sprinkler Inspection Quarterly Sprinkler Inspection
8/1/23 1:28pm (EA) Spoke Art and he confirmed the scheduled date 8/2/23 - Art said we can be there anytime after 9 am but before 2 pm. Sprinkler Repair The tech will remove and replace the outdated water gauges. NFPA 25 (13.2.7.2) Gauges shall be replaced every 5 years Deficiency: Sprinkler system is due for five year gauge replacement 2- 300# air/water gauges.
6/30/23 Confirmed with Mr. Jones for 7/5/23 at 8:00am DH Sprinkler Inspection Annual Sprinkler Inspection (2 Wet Sprinkler Systems) Deficiency: Sprinkler system is due for five year gauge replacement 2- 300# air/water gauges.
Sprinkler Inspection Annual Sprinkler Inspection ***COMMERCIAL FIRE PAPERWORK***
Sprinkler Inspection Quarterly Sprinkler Inspection ***COMMERCIAL FIRE PAPERWORK***