Conducted warranty inspection of in-floor heating system installed in March. Documented structural issues including significant concrete cracking and pipe damage in the recreation room. Multiple photos taken showing vertical fractures in the concrete with visible moisture damage and discoloration around affected areas. Scheduled service advisor for further assessment.