Replaced failed PSC draft combustion inducer blower assembly on customer's furnace. Completed installation of new inducer motor assembly and verified proper operation. Post-repair combustion analysis with Testo 310 confirmed optimal performance with 97.2% efficiency, CO2 at 8 ppm, and CO at 5 ppm.