Completed installation of a new main water service valve (up to 1") before the meter and replaced the frost-free hose bibb utilizing existing connections. Service included complete repiping of the meter/main valve assembly and installation of a new exterior frost-proof spigot with proper interior piping through the wooden framing structure.