Replaced defective smoke control board on electric boiler system, requiring complete rewiring due to different board configuration. Added water to restore proper system pressure (15+ psi), and verified operation of all loops. Also performed standard furnace tune-up on Pulse system including temperature rise check, drain cleaning, electrical component inspection, and air exchanger cleaning.