Added 10 gallons of ProTek glycol freeze protector to the boiler system, achieving 30% concentration as specified in the estimate. Identified and repaired a gas leak at an old tee connection to the water heater by cutting out the deteriorated section and installing a coupling. Performed operational testing to verify proper circulation and heating function of the boiler system with all components now working correctly.