We arrived on Thursday to finish the work of running a new line to the pool pump as well as performing panel maintenance. We met with the dig team on site and they proceeded in running the trench from the inside corner of the house by the back porch area to the right side of the pool. The dig team completed the trench, and we proceeded with running the half inch pipe run. After finishing the run, the dig team buried the line. During their trenching, they cut an irrigation channel that was next to the house in which the dig team was able to repair the corrugated pipe. We dug in a 4 x 4 post at the end of the pipe run to mount the receptacle and piping to. We mounted the piping up the side of the home and ran Romax on the inside of the home to the panel. We completed the transition from THHN to Romax inside of a box mounted at the top of the pipe run. I was able to change out the breakers in the subpanel to make room for the GFCI breaker. I finished the wiring in the panel and we tested