We will be adding 30amp 240/120 volt circuit from the meter box to a sub panel. The sub panel will be located at the front gate where the driveway begins for a gate and column lights. We will run conduit out the bottom of the meter along the brick. Go behind the A/Cs till the corner of the brick. We will put a junction box at the corner of the brick. From that junction box we will bore all the way down towards the front gate where the driveway begins. Once the trench is bored, we will lay conduit from the junction box to the front gate in the trench. We will stub up the conduit by the gate column. We will also be boring under the driveway by the gate. This will allow us to run conduit under the driveway without damaging the driveway concrete. Once the boring is done we will run conduit under the driveway and stub up the pipe for the lights. Once we have all the conduit done. The columns will need to be built. Once the columns are done we will be able to run all our wire. We will run wi