Ran plumbing to basement bar, this included drain pipe for sink, water lines for sink including 5 stops below sink, 2 hot and 3 cold. All drain tie ins, under counter ice maker with drain and water attachment as well as replaced gate valve with new ball valve and access panel for backyard hose bib. Water turned on and tested all to ensure proper function.