Will abandon existing gas main that goes underground to feed unit. Have dig team trench from gas meter around building to back porch/courtyard area. Will need to saw cut and remove a portion of the brick to where they can shoot a small bore rod to corner of back patio. From there I will hard pipe up the side of the nook area on the outside and go through the brick into dining room wall, up to the ceiling and over to mechanical room. Updated: gas line has been completely redone from county meter to inside of home. Inspection is set for Monday so the trench is currently open with caution tape everywhere. Pressure is set to 15 psi and everything is holding.