Yesterday, a repair was done on the well shared by the customer and other members of the community. After water was restored by the other contractor, this customer remained without water. On inspection we found that the pressure reducing valve located in the valve box was clogged with debris, likely a result of the recent repairs to the well system. We Replaced the PRV in water shutoff box and set the pressure to 60 psi. We had to connect to the existing thin wall poly well piping. We ran the water for about 15 minutes to remove the majority of the dirt that was in the water lines due to the repair on the well system yesterday.