I performed a complete lightning inspection. Run two new ground rods and new ground wire from ground rods to panel separate grounds from neutral bar and separate neutrals. Drive new ground rod for cable box on back of home and install terminal block with new ground for terminal low voltage blocks. Replace 2 outlets in upstairs bedroom and full Redevice in office. Update both breakers to safety breakers. Install GFI protection in areas required that does not have protection Replace flood light and install new box. Splice in new wire (4’) in attic