Robert is professional in doing great job up to fine details, well organized. Sure I will request him for my next inspection job. Well done Robert.
8/15/23 Confirmed by Rey for 8/21/23 in the afternoon / Sent email regarding inspection DH 8/8/23MV Reached out to Reyad regarding inspection date 8/9, waiting on confirmaiton Sprinkler Inspection Annual Sprinkler Inspection
7/28/23 Sent email regarding inspection DH Sprinkler Inspection Annual Fire Sprinkler Inspection (1 Domestic System) Deficiency: Missing main control valve sign. (1) Sg3 gauge. 5 year internal, (2) 2” couplings. 2 hours of labor. Deficiency: Missing main control valve sign. (1) Sg3 gauge. 5 year internal, (2) 2” couplings. 2 hours of labor.
8/29/22 Confirmed by Rey for 8/30/22 / Sent email regarding inspection DH Sprinkler Inspection Deficiency: missing eight chrome esecu. viking Deficiency: 2 walk in coolers in back of building not protected. Large cooler will need 2 dry pendant heads and smaller cooler will need 1. Lift will be needed to reach supply piping above coolers. There is a “ main above that has 2” branch lines along it. Ceiling around 20 feet up. Deficiency: There is no evidence of five-year internal pipe obstruction investigation Deficiency: There is no evidence of five year internal check valve inspection for fire department connection also there is no evidence of five year Hydro test for fire department connection Deficiency: 2 walk in coolers in back of building not protected. Large cooler will need 2 dry pendant heads and smaller cooler will need 1. 12” Lift will be needed to reach supply piping above coolers. There is a “ main above that has 2” branch lines along it. Ceiling around 20 feet up. A li
Completed annual Fire Extinguisher inspection for 2022
6/16/21 Rescheduled with Sabrina for Thursday 6/24/21 sM 6/14/21 confirmed with Sabrina for 6/17/21 sM 6/10/21 Called and Talked to Rose to get on the Schedule . she is having the Maintenance guy call me to get on the Schedule SM Kitchen Suppression Inspection Semiannual Kitchen System Inspection Deficiency: Number of Systems failed : 1
Annual Extinguisher Inspection (42) Portable Extinguishers Portable Extinguishers Inspection